<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Home - Concelex</title>
	<atom:link href="https://concelex.ro/projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://concelex.ro/</link>
	<description>Heavy works carried lightly</description>
	<lastBuildDate>Thu, 28 May 2026 08:49:51 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://concelex.ro/wp-content/uploads/2026/05/fav-c.png</url>
	<title>Home - Concelex</title>
	<link>https://concelex.ro/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Bârlad Ringroad</title>
		<link>https://concelex.ro/projects/barlad-ringroad/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Sun, 17 May 2026 20:35:53 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/projects/the-barlad-detour-variant/</guid>

					<description><![CDATA[<p>We completed the Bârlad Ringroad, a road infrastructure project designed to divert transit traffic outside the city. The route has a total length of 11.28 km and is connected to the existing national road network. The project includes 3 major intersections, 4 bridges, 3 overpasses, 24 culverts and two short‑term parking areas. The bypass significantly [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/barlad-ringroad/">Bârlad Ringroad</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We completed the Bârlad Ringroad, a road infrastructure project designed to divert transit traffic outside the city. The route has a total length of 11.28 km and is connected to the existing national road network. The project includes 3 major intersections, 4 bridges, 3 overpasses, 24 culverts and two short‑term parking areas. The bypass significantly reduces heavy traffic within the city, improving road safety and traffic flow.</p>
<p>The post <a href="https://concelex.ro/projects/barlad-ringroad/">Bârlad Ringroad</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Orhideea Gardens &#038; Orhideea Spa</title>
		<link>https://concelex.ro/projects/orhideea-gardens-orhideea-spa/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:28:58 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=977</guid>

					<description><![CDATA[<p>We built the Orhideea Gardens complex, a project that integrates residential and hospitality functions within a single urban development. The residential component comprises five apartment buildings, with two underground levels and 12 above‑ground floors, totaling 375 apartments and 408 parking spaces. The complex is complemented by a building dedicated to the hospitality sector, which includes [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/orhideea-gardens-orhideea-spa/">Orhideea Gardens &amp; Orhideea Spa</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We built the Orhideea Gardens complex, a project that integrates residential and hospitality functions within a single urban development. </p>



<p class="wp-block-paragraph">The residential component comprises five apartment buildings, with two underground levels and 12 above‑ground floors, totaling 375 apartments and 408 parking spaces. </p>



<p class="wp-block-paragraph">The complex is complemented by a building dedicated to the hospitality sector, which includes hotel rooms and leisure facilities such as a swimming pool and a SPA area. The total built area of the complex is approximately 60,200 sqm.9</p>
<p>The post <a href="https://concelex.ro/projects/orhideea-gardens-orhideea-spa/">Orhideea Gardens &amp; Orhideea Spa</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cuza 99</title>
		<link>https://concelex.ro/projects/cuza-99/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:27:42 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=976</guid>

					<description><![CDATA[<p>Cuza 99 is a premium residential development in central Bucharest, structured as a basement, ground floor and six upper levels. It includes 42 premium apartments and stands out through its elegant architecture and internationally recognized design. The project received the Residential Development award at the European Property Awards (2017) and Best Residential Development at the [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/cuza-99/">Cuza 99</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Cuza 99 is a premium residential development in central Bucharest, structured as a basement, ground floor and six upper levels. </p>



<p class="wp-block-paragraph">It includes 42 premium apartments and stands out through its elegant architecture and internationally recognized design. The project received the Residential Development award at the European Property Awards (2017) and Best Residential Development at the EEC European Property Awards (2018).</p>
<p>The post <a href="https://concelex.ro/projects/cuza-99/">Cuza 99</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Slatina Waste Water Treatment Plant</title>
		<link>https://concelex.ro/projects/slatina-waste-water-treatment-plant/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:25:52 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=975</guid>

					<description><![CDATA[<p>We carried out rehabilitation and modernization works at the Slatina wastewater treatment plant. Designed to serve 73,000 inhabitants, the Slatina Wastewater Treatment Plant has a treatment capacity of up to 23,000 cubic meters of water per day. The works included the rehabilitation of the mechanical and biological treatment stages and the construction of two new [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/slatina-waste-water-treatment-plant/">Slatina Waste Water Treatment Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We carried out rehabilitation and modernization works at the Slatina wastewater treatment plant. </p>



<p class="wp-block-paragraph">Designed to serve 73,000 inhabitants, the Slatina Wastewater Treatment Plant has a treatment capacity of up to 23,000 cubic meters of water per day. </p>



<p class="wp-block-paragraph">The works included the rehabilitation of the mechanical and biological treatment stages and the construction of two new treatment lines: a tertiary wastewater treatment line for nitrogen and phosphorus removal, and a sludge treatment line. </p>



<p class="wp-block-paragraph">We also built new facilities to accommodate chemical and biological analysis laboratories for wastewater monitoring.</p>
<p>The post <a href="https://concelex.ro/projects/slatina-waste-water-treatment-plant/">Slatina Waste Water Treatment Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cooling Tower Halanga</title>
		<link>https://concelex.ro/projects/cooling-tower-halanga/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:23:51 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=954</guid>

					<description><![CDATA[<p>We delivered the only newly built hyperbolic cooling tower in Romania over the past 30 years, with a height of 60 meters and a capacity of 10,000 cubic meters.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-tower-halanga/">Cooling Tower Halanga</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We delivered the only newly built hyperbolic cooling tower in Romania over the past 30 years, with a height of 60 meters and a capacity of 10,000 cubic meters.</p>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://concelex.ro/projects/cooling-tower-halanga/">Cooling Tower Halanga</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>M4 Metro Line Extension</title>
		<link>https://concelex.ro/projects/m4-metro-line-extension/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 07:46:33 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=898</guid>

					<description><![CDATA[<p>We are carrying out construction works as part of the M4 metro line extension project, on the Eroii Revoluției – Gara Progresul section (Lot 2). The project involves the execution of a new underground infrastructure segment, part of a metro line with a total length of approximately 11 km, including 14 new stations, designed to [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/m4-metro-line-extension/">M4 Metro Line Extension</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We are carrying out construction works as part of the M4 metro line extension project, on the Eroii Revoluției – Gara Progresul section (Lot 2). The project involves the execution of a new underground infrastructure segment, part of a metro line with a total length of approximately 11 km, including 14 new stations, designed to connect the northern and southern areas of Bucharest. The works contribute to increasing public transport capacity, reducing surface traffic and improving urban mobility through a modern, efficient and sustainable transport infrastructure.</p>
<p>The post <a href="https://concelex.ro/projects/m4-metro-line-extension/">M4 Metro Line Extension</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Penetration Prelungirea Ghencea</title>
		<link>https://concelex.ro/projects/penetration-prelungirea-ghencea/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 07:46:09 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=896</guid>

					<description><![CDATA[<p>We are carrying out road infrastructure and public transport works as part of the Penetration Prelungirea Ghencea – Domnești project, aimed at improving urban mobility in the western area of Bucharest. The project includes widening Prelungirea Ghencea to four traffic lanes along a 2.46 km section, extending and modernizing the tram line over a total [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/penetration-prelungirea-ghencea/">Penetration Prelungirea Ghencea</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We are carrying out road infrastructure and public transport works as part of the Penetration Prelungirea Ghencea – Domnești project, aimed at improving urban mobility in the western area of Bucharest. </p>



<p class="wp-block-paragraph">The project includes widening Prelungirea Ghencea to four traffic lanes along a 2.46 km section, extending and modernizing the tram line over a total of 5.73 km of double track, as well as the development of sidewalks and bicycle lanes. </p>



<p class="wp-block-paragraph">We are implementing modern LED public lighting systems, traffic management solutions and traffic signalization for 12 intersections and pedestrian crossings, alongside extensive utility works and the construction of a Park &amp; Ride facility with over 490 parking spaces, designed to support public transport use.</p>
<p>The post <a href="https://concelex.ro/projects/penetration-prelungirea-ghencea/">Penetration Prelungirea Ghencea</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cooling Towers SE Rovinari</title>
		<link>https://concelex.ro/projects/cooling-towers-se-rovinari/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Fri, 22 May 2026 07:45:03 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=895</guid>

					<description><![CDATA[<p>We conducted rehabilitation and upgrading works of Cooling Towers No. 3 and No. 4, natural‑draft wet cooling towers with crossflow configuration, for Complexul Energetic Oltenia, Rovinari Power Plant.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-towers-se-rovinari/">Cooling Towers SE Rovinari</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We conducted rehabilitation and upgrading works of Cooling Towers No. 3 and No. 4, natural‑draft wet cooling towers with crossflow configuration, for Complexul Energetic Oltenia, Rovinari Power Plant.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-towers-se-rovinari/">Cooling Towers SE Rovinari</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Medex Oncology Hospital, Târgu Mureș</title>
		<link>https://concelex.ro/projects/medex-oncology-hospital-targu-mures/</link>
		
		<dc:creator><![CDATA[]]></dc:creator>
		<pubDate>Sun, 17 May 2026 20:35:24 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/projects/medex-oncology-hospital-targu-mures/</guid>

					<description><![CDATA[<p>Medex Oncology Hospital in Sângeorgiu de Mureș stands as a benchmark for modern oncology care, developed across an area of more than 10,700 square meters and structured over five operational levels. Designed to provide integrated diagnostic and treatment services, the hospital benefits from high-performance medical infrastructure, including three bunkers dedicated to advanced technologies used in [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/medex-oncology-hospital-targu-mures/">Medex Oncology Hospital, Târgu Mureș</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Medex Oncology Hospital in Sângeorgiu de Mureș stands as a benchmark for modern oncology care, developed across an area of more than 10,700 square meters and structured over five operational levels. Designed to provide integrated diagnostic and treatment services, the hospital benefits from high-performance medical infrastructure, including three bunkers dedicated to advanced technologies used in the care of oncology patients. The facility  includes more than 50 patient rooms, with over 115 inpatient beds, and is equipped with the first PET-CT scanner in Mureș County, contributing to greater diagnostic accuracy and to the development of a modern, efficient, and patient-centered treatment pathway.</p>
<p>The post <a href="https://concelex.ro/projects/medex-oncology-hospital-targu-mures/">Medex Oncology Hospital, Târgu Mureș</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Craiova Regional Emergency Hospital</title>
		<link>https://concelex.ro/projects/craiova-regional-emergency-hospital/</link>
		
		<dc:creator><![CDATA[]]></dc:creator>
		<pubDate>Sun, 17 May 2026 20:35:30 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/projects/craiova-regional-emergency-hospital/</guid>

					<description><![CDATA[<p>Craiova Regional Emergency Hospital (SRU) is a state-of-the-art medical facility developed by the Ministry of Health through ANDIS, designed to serve over 250,000 patients annually. With 807 inpatient beds, 45 day-care beds, and six specialized medical centers, the hospital integrates advanced technologies and includes a ground-level heliport with direct access to the Emergency Unit, compatible [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/craiova-regional-emergency-hospital/">Craiova Regional Emergency Hospital</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Craiova Regional Emergency Hospital (SRU) is a state-of-the-art medical facility developed by the Ministry of Health through ANDIS, designed to serve over 250,000 patients annually. With 807 inpatient beds, 45 day-care beds, and six specialized medical centers, the hospital integrates advanced technologies and includes a ground-level heliport with direct access to the Emergency Unit, compatible with Black Hawk S70 helicopters. The 2S+P+5E structure reflects Romania’s commitment to modern, high-quality healthcare infrastructure.</p>
<p>The post <a href="https://concelex.ro/projects/craiova-regional-emergency-hospital/">Craiova Regional Emergency Hospital</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
