<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Home - Concelex</title>
	<atom:link href="https://concelex.ro/project-category/energy-critical-systems/feed/" rel="self" type="application/rss+xml" />
	<link>https://concelex.ro/</link>
	<description>Heavy works carried lightly</description>
	<lastBuildDate>Wed, 15 Jul 2026 11:28:56 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://concelex.ro/wp-content/uploads/2026/06/favicon.png</url>
	<title>Home - Concelex</title>
	<link>https://concelex.ro/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Slatina Waste Water Treatment Plant</title>
		<link>https://concelex.ro/projects/slatina-waste-water-treatment-plant/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:25:52 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=975</guid>

					<description><![CDATA[<p>We carried out rehabilitation and modernization works at the Slatina wastewater treatment plant. Designed to serve 73,000 inhabitants, the Slatina Wastewater Treatment Plant has a treatment capacity of up to 23,000 cubic meters of water per day. The works included the rehabilitation of the mechanical and biological treatment stages and the construction of two new [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/slatina-waste-water-treatment-plant/">Slatina Waste Water Treatment Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We carried out rehabilitation and modernization works at the Slatina wastewater treatment plant. </p>



<p class="wp-block-paragraph">Designed to serve 73,000 inhabitants, the Slatina Wastewater Treatment Plant has a treatment capacity of up to 23,000 cubic meters of water per day. </p>



<p class="wp-block-paragraph">The works included the rehabilitation of the mechanical and biological treatment stages and the construction of two new treatment lines: a tertiary wastewater treatment line for nitrogen and phosphorus removal, and a sludge treatment line. </p>



<p class="wp-block-paragraph">We also built new facilities to accommodate chemical and biological analysis laboratories for wastewater monitoring.</p>
<p>The post <a href="https://concelex.ro/projects/slatina-waste-water-treatment-plant/">Slatina Waste Water Treatment Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Dry Storage Facility Nuclearelectrica</title>
		<link>https://concelex.ro/projects/dry-storage-facility-nuclearelectrica/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Sun, 17 May 2026 20:35:54 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/projects/dry-storage-facility-nuclearelectrica-depozitul-intermediar-de-combustibil-ars-nuclearelectrica/</guid>

					<description><![CDATA[<p>We are expanding the Intermediate Dry Storage Facility (DICA) at the Cernavodă Nuclear Power Plant, a strategic project that will increase the storage capacity required for the plant’s long‑term operation. The works include the construction of modules 18–23, equipping them with storage cylinders, installation and enclosure works, as well as the design and assembly of [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/dry-storage-facility-nuclearelectrica/">Dry Storage Facility Nuclearelectrica</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We are expanding the Intermediate Dry Storage Facility (DICA) at the Cernavodă Nuclear Power Plant, a strategic project that will increase the storage capacity required for the plant’s long‑term operation. The works include the construction of modules 18–23, equipping them with storage cylinders, installation and enclosure works, as well as the design and assembly of a high‑capacity gantry crane. The project builds on Concelex’s previous experience in nuclear infrastructure, following our earlier contribution to the development of DICA facilities.</p>
<p>The post <a href="https://concelex.ro/projects/dry-storage-facility-nuclearelectrica/">Dry Storage Facility Nuclearelectrica</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cooling Tower Halanga</title>
		<link>https://concelex.ro/projects/cooling-tower-halanga/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Fri, 22 May 2026 09:23:51 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=954</guid>

					<description><![CDATA[<p>We delivered the only newly built hyperbolic cooling tower in Romania over the past 30 years, with a height of 60 meters and a capacity of 10,000 cubic meters.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-tower-halanga/">Cooling Tower Halanga</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We delivered the only newly built hyperbolic cooling tower in Romania over the past 30 years, with a height of 60 meters and a capacity of 10,000 cubic meters.</p>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://concelex.ro/projects/cooling-tower-halanga/">Cooling Tower Halanga</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cooling Towers SE Rovinari</title>
		<link>https://concelex.ro/projects/cooling-towers-se-rovinari/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Fri, 22 May 2026 07:45:03 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/?post_type=project&#038;p=895</guid>

					<description><![CDATA[<p>We conducted rehabilitation and upgrading works of Cooling Towers No. 3 and No. 4, natural‑draft wet cooling towers with crossflow configuration, for Complexul Energetic Oltenia, Rovinari Power Plant.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-towers-se-rovinari/">Cooling Towers SE Rovinari</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">We conducted rehabilitation and upgrading works of Cooling Towers No. 3 and No. 4, natural‑draft wet cooling towers with crossflow configuration, for Complexul Energetic Oltenia, Rovinari Power Plant.</p>
<p>The post <a href="https://concelex.ro/projects/cooling-towers-se-rovinari/">Cooling Towers SE Rovinari</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Infrastructure Works &#8211; Cernavodă Nuclear Power Plant</title>
		<link>https://concelex.ro/projects/infrastructure-works-cernavoda-nuclear-power-plant/</link>
		
		<dc:creator><![CDATA[Mihai Craciun]]></dc:creator>
		<pubDate>Sun, 17 May 2026 20:36:15 +0000</pubDate>
				<guid isPermaLink="false">https://staging.spread.technology/concelex/projects/infrastructure-works-cernavoda-nuclear-power-plant-lucrari-de-infrastructura-centrala-nucleara-cernavoda/</guid>

					<description><![CDATA[<p>We are delivering a complex package of construction and infrastructure works as part of the refurbishment program of Unit 1 at the Cernavodă Nuclear Power Plant. The scope includes technical and administrative buildings, operational platforms, logistics areas, access control facilities, internal roads, fire‑fighting water reservoirs with pumping stations, utility networks and systems for groundwater monitoring. [&#8230;]</p>
<p>The post <a href="https://concelex.ro/projects/infrastructure-works-cernavoda-nuclear-power-plant/">Infrastructure Works &#8211; Cernavodă Nuclear Power Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We are delivering a complex package of construction and infrastructure works as part of the refurbishment program of Unit 1 at the Cernavodă Nuclear Power Plant. The scope includes technical and administrative buildings, operational platforms, logistics areas, access control facilities, internal roads, fire‑fighting water reservoirs with pumping stations, utility networks and systems for groundwater monitoring. The works also involve the relocation of existing utilities and the implementation of security and surveillance systems, ensuring safe and uninterrupted operations in a highly regulated nuclear environment.</p>
<p>The post <a href="https://concelex.ro/projects/infrastructure-works-cernavoda-nuclear-power-plant/">Infrastructure Works &#8211; Cernavodă Nuclear Power Plant</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>