<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Home - Concelex</title>
	<atom:link href="https://concelex.ro/category/press-releases/feed/" rel="self" type="application/rss+xml" />
	<link>https://concelex.ro/</link>
	<description>Heavy works carried lightly</description>
	<lastBuildDate>Wed, 23 Sep 2026 06:56:57 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://concelex.ro/wp-content/uploads/2026/06/favicon.png</url>
	<title>Home - Concelex</title>
	<link>https://concelex.ro/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Concelex proposes in New York a new approach to investments in strategic infrastructure on NATO&#8217;s Eastern Flank</title>
		<link>https://concelex.ro/concelex-proposes-in-new-york-a-new-approach-to-investments-in-strategic-infrastructure-on-natos-eastern-flank/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Wed, 23 Sep 2026 06:44:42 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://concelex.ro/?p=22494</guid>

					<description><![CDATA[<p>On the sidelines of the UN General Assembly in New York, Concelex and Atlantic Council Romania hosted the roundtable &#8220;Anchoring the Eastern Flank: Critical Infrastructure and Transatlantic Capital in Central and Eastern Europe&#8221;, which was addressed by the President of Romania, Nicușor Dan. The event looked at how strategic infrastructure on the Eastern Flank will [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-proposes-in-new-york-a-new-approach-to-investments-in-strategic-infrastructure-on-natos-eastern-flank/">Concelex proposes in New York a new approach to investments in strategic infrastructure on NATO&#8217;s Eastern Flank</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<div class="wp-block-media-text is-stacked-on-mobile"><figure class="wp-block-media-text__media"><img fetchpriority="high" decoding="async" width="1024" height="683" src="https://concelex.ro/wp-content/uploads/2026/09/6-1024x683.png" alt="" class="wp-image-22496 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/09/6-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/6-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/6-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/6-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/6.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">On the sidelines of the UN General Assembly in New York, Concelex and Atlantic Council Romania hosted the roundtable &#8220;Anchoring the Eastern Flank: Critical Infrastructure and Transatlantic Capital in Central and Eastern Europe&#8221;, which was addressed by the President of Romania, Nicușor Dan. The event looked at how strategic infrastructure on the Eastern Flank will be assessed and financed over the next decade of investment.</p>



<p class="wp-block-paragraph"></p>
</div></div>
</div>



<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph"></p>



<p class="wp-block-paragraph">Participants examined how the lessons learned from Ukraine are redefining infrastructure requirements near NATO&#8217;s eastern border. The rapid restoration of a railway bridge, a transformer substation or a hospital depends critically on the immediate on-site availability of heavy equipment, compatible structural components and certified response teams, capabilities that cannot be mobilized within days in a crisis scenario.</p>



<p class="wp-block-paragraph">&#8220;Ukraine has shown us that an asset is brought back into service by the capacity that exists before a crisis. Recovery depends on the equipment and crews already present in the territory, and full knowledge of how an asset works and how it fails stays with whoever built it. A state may hold every repair capability and still remain exposed if that knowledge sits under another jurisdiction. This makes the infrastructure industry a security capability, not just an economic one,&#8221; said Radu Pițurlea, CEO of Concelex and member of Atlantic Council’s Board of Directors.</p>



<p class="wp-block-paragraph">Concelex put forward two proposals. The first is to add delivery capacity to the qualification criteria for strategic projects, alongside the existing financial and regulatory criteria. The second is to give priority to long-term, availability-based public-private partnerships along strategic corridors, where the region&#8217;s infrastructure companies are prepared to invest their own capital alongside transatlantic investors. So that both proposals can be verified, the company proposed a Strategic Infrastructure Index for NATO&#8217;s Eastern Flank, which would record who can build each asset, who can restore it, how quickly, and under which jurisdiction.</p>



<p class="wp-block-paragraph">One of the event&#8217;s conclusions was that American investors see the Eastern Flank as one of the decade&#8217;s major investment opportunities, provided that projects come with clearly allocated risks and with local partners able to build and maintain them over the long term. In this context, the region&#8217;s infrastructure companies were approached as direct partners of transatlantic capital, and their delivery capacity as a criterion that should be measured and taken into account when strategic projects are assessed.</p>



<p class="wp-block-paragraph">Alongside President Nicușor Dan, the event was attended by Minister of Finance Alexandru Nazare, Presidential Advisors Marius Lazurca (National Security and Foreign Policy) and Radu Burnete (Economic and Social Policy), and Romania&#8217;s Ambassador to the United States, Andrei Muraru. Also at the roundtable were the Washington-based ambassadors of several Central and Eastern European countries, diplomats with experience in the region, representatives of the U.S. International Development Finance Corporation (DFC), investment banks and global funds, and American and Romanian companies in energy, engineering and infrastructure.</p>



<p class="wp-block-paragraph">The discussion was hosted by Frederick Kempe, Atlantic Council’s President and CEO, and moderated by Landon Derentz, the organization&#8217;s Vice President for Energy and Infrastructure.</p>



<p class="wp-block-paragraph">&#8220;The partners the transatlantic relationship relies on matter today more than ever. Developments in the international environment are passed on through energy prices, transport routes, supply chains and the cost of capital, and they reach every project in this region. That is why infrastructure, energy and communications can no longer be planned country by country. They must be prioritized and integrated across borders,&#8221; said Frederick Kempe, President and CEO, Atlantic Council.</p>



<p class="wp-block-paragraph">Concelex&#8217;s proposals will be further developed together with Atlantic Council, and participants agreed to continue the discussion at an event to be held in Bucharest.</p>
</div>



<p class="wp-block-paragraph"></p>



<p class="wp-block-paragraph"></p>



<figure class="wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex">
<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="683" data-id="22506" src="https://concelex.ro/wp-content/uploads/2026/09/4-1024x683.png" alt="" class="wp-image-22506" srcset="https://concelex.ro/wp-content/uploads/2026/09/4-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/4-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/4-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/4-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/4.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="683" data-id="22498" src="https://concelex.ro/wp-content/uploads/2026/09/9-1024x683.png" alt="" class="wp-image-22498" srcset="https://concelex.ro/wp-content/uploads/2026/09/9-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/9-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/9-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/9-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/9.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="683" data-id="22502" src="https://concelex.ro/wp-content/uploads/2026/09/7-1024x683.png" alt="" class="wp-image-22502" srcset="https://concelex.ro/wp-content/uploads/2026/09/7-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/7-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/7-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/7-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/7.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="683" data-id="22504" src="https://concelex.ro/wp-content/uploads/2026/09/5-1024x683.png" alt="" class="wp-image-22504" srcset="https://concelex.ro/wp-content/uploads/2026/09/5-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/5-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/5-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/5-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/5.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="683" data-id="22500" src="https://concelex.ro/wp-content/uploads/2026/09/8-1024x683.png" alt="" class="wp-image-22500" srcset="https://concelex.ro/wp-content/uploads/2026/09/8-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/8-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/8-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/8-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/8.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="683" data-id="22510" src="https://concelex.ro/wp-content/uploads/2026/09/2-1024x683.png" alt="" class="wp-image-22510" srcset="https://concelex.ro/wp-content/uploads/2026/09/2-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/2-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/2-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/2-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/2.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="2048" height="1365" data-id="22508" src="https://concelex.ro/wp-content/uploads/2026/09/3-1024x683.png" alt="" class="wp-image-22508" srcset="https://concelex.ro/wp-content/uploads/2026/09/3-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/3-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/3-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/3-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/3.png 2048w" sizes="(max-width: 2048px) 100vw, 2048px" /></figure>



<figure class="wp-block-image size-large"><img loading="lazy" decoding="async" width="1024" height="683" data-id="22512" src="https://concelex.ro/wp-content/uploads/2026/09/1-1024x683.png" alt="" class="wp-image-22512" srcset="https://concelex.ro/wp-content/uploads/2026/09/1-1024x683.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/1-300x200.png 300w, https://concelex.ro/wp-content/uploads/2026/09/1-768x512.png 768w, https://concelex.ro/wp-content/uploads/2026/09/1-1536x1024.png 1536w, https://concelex.ro/wp-content/uploads/2026/09/1.png 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>
</figure>
<p>The post <a href="https://concelex.ro/concelex-proposes-in-new-york-a-new-approach-to-investments-in-strategic-infrastructure-on-natos-eastern-flank/">Concelex proposes in New York a new approach to investments in strategic infrastructure on NATO&#8217;s Eastern Flank</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex strengthens its management team: Daniel Spiridon and Carol Șerban join the company in key strategy and transformation roles</title>
		<link>https://concelex.ro/concelex-strengthens-its-management-team-daniel-spiridon-and-carol-serban-join-the-company-in-key-strategy-and-transformation-roles/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Fri, 04 Sep 2026 09:18:02 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://concelex.ro/?p=22429</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian construction company, is strengthening its management team with the addition of two professionals with international backgrounds in strategy and transformation. Daniel Spiridon, with over 20 years’ experience in management consulting and executive leadership, has joined Concelex as Deputy CEO Strategy, while Carol Șerban, a construction engineering graduate with international experience in [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-strengthens-its-management-team-daniel-spiridon-and-carol-serban-join-the-company-in-key-strategy-and-transformation-roles/">Concelex strengthens its management team: Daniel Spiridon and Carol Șerban join the company in key strategy and transformation roles</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<div class="wp-block-media-text is-stacked-on-mobile"><figure class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="1024" height="503" src="https://concelex.ro/wp-content/uploads/2026/09/Colaj-numiri-1024x503.png" alt="" class="wp-image-22431 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/09/Colaj-numiri-1024x503.png 1024w, https://concelex.ro/wp-content/uploads/2026/09/Colaj-numiri-300x147.png 300w, https://concelex.ro/wp-content/uploads/2026/09/Colaj-numiri-768x377.png 768w, https://concelex.ro/wp-content/uploads/2026/09/Colaj-numiri.png 1116w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian construction company, is strengthening its management team with the addition of two professionals with international backgrounds in strategy and transformation. Daniel Spiridon, with over 20 years’ experience in management consulting and executive leadership, has joined Concelex as Deputy CEO Strategy, while Carol Șerban, a construction engineering graduate with international experience in strategic consulting, as Director of Strategy and Transformation.</p>



<p class="wp-block-paragraph"></p>
</div></div>
</div>



<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph"> The two appointments support Concelex&#8217;s current phase of accelerated growth and strengthen the company&#8217;s capabilities in strategy, organizational transformation, and business development.</p>



<p class="wp-block-paragraph">“Concelex has reached a stage where the scale of the projects we manage and the company’s accelerated growth prospects require us to continuously strengthen our leadership team. Daniel and Carol bring complementary experience and a valuable perspective on how we build, organize, and prepare for the next stage of growth. They are professionals with a solid track record in their fields, and I am confident they will make a significant contribution to Concelex&#8217;s development in the coming years,&#8221; said Radu Pițurlea, Chairman and CEO, Concelex.</p>



<p class="wp-block-paragraph">Daniel Spiridon spent more than 15 years at McKinsey &amp; Company, where he rose through every stage of his career to become Managing Partner of the local office, leading complex strategic projects for top organizations in Romania and the region. He subsequently joined eMAG as VP Business Development and Strategy and, as CEO, led eMAG&#8217;s operations in Hungary. A graduate in economics, Daniel also holds a Master&#8217;s degree in International Business and Finance from BI Norwegian Business School. As Deputy CEO Strategy, Daniel will oversee the implementation of Concelex&#8217;s strategy, develop the Strategy and Transformation function, and be involved in developing and optimizing the company&#8217;s business portfolio, with the goal of strengthening its competitiveness and profitability.</p>



<p class="wp-block-paragraph">Carol Șerban brings a rare combination for the local market: a construction engineering educational background paired with experience in international strategic consulting. A graduate of the Technical University of Civil Engineering Bucharest, he holds a Master&#8217;s degree in Structural Engineering from the University of Manchester and an MBA from the University of Oxford. He began his career in the UK, where he spent seven years civil and structural engineering and project management, before joining Kearney&#8217;s Romania office. He has also held the position of Commercial Director at Glovo Romania. As Director of Strategy and Transformation at Concelex, Carol will coordinate organizational transformation programs, with a focus on optimizing business processes, accelerating digitalization, and identifying strategic initiatives to support the company&#8217;s performance.</p>



<p class="wp-block-paragraph">The two appointments come in a year in which Concelex has continued to win major projects in areas such as energy, infrastructure, and urban regeneration, and has budgeted a 70% year-on-year growth in revenues.</p>
</div>
<p>The post <a href="https://concelex.ro/concelex-strengthens-its-management-team-daniel-spiridon-and-carol-serban-join-the-company-in-key-strategy-and-transformation-roles/">Concelex strengthens its management team: Daniel Spiridon and Carol Șerban join the company in key strategy and transformation roles</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex to retrofit the &#8220;Bulandra&#8221; Theatre building at 1 Schitu Măgureanu Street</title>
		<link>https://concelex.ro/concelex-to-retrofit-the-bulandra-theatre-building-at-1-schitu-magureanu-street/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Thu, 06 Aug 2026 10:11:45 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://concelex.ro/?p=22364</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian construction company, will design and carry out the reinforcement, rehabilitation and modernization works for the building at 1 Schitu Măgureanu Street, which houses the &#8220;Lucia Sturdza Bulandra&#8221; Municipal Theatre and premises belonging to the University of Bucharest. Listed under seismic risk class I (RsI), the building is managed by the Municipal [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-to-retrofit-the-bulandra-theatre-building-at-1-schitu-magureanu-street/">Concelex to retrofit the &#8220;Bulandra&#8221; Theatre building at 1 Schitu Măgureanu Street</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<div class="wp-block-media-text is-stacked-on-mobile"><figure class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="1024" height="630" src="https://concelex.ro/wp-content/uploads/2026/08/Poza-articol-Schitu-Magureanu-1024x630.png" alt="" class="wp-image-22366 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/08/Poza-articol-Schitu-Magureanu-1024x630.png 1024w, https://concelex.ro/wp-content/uploads/2026/08/Poza-articol-Schitu-Magureanu-300x184.png 300w, https://concelex.ro/wp-content/uploads/2026/08/Poza-articol-Schitu-Magureanu-768x472.png 768w, https://concelex.ro/wp-content/uploads/2026/08/Poza-articol-Schitu-Magureanu.png 1036w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian construction company, will design and carry out the reinforcement, rehabilitation and modernization works for the building at 1 Schitu Măgureanu Street, which houses the &#8220;Lucia Sturdza Bulandra&#8221; Municipal Theatre and premises belonging to the University of Bucharest. Listed under seismic risk class I (RsI), the building is managed by the Municipal Administration for the Consolidation of Buildings at Seismic Risk (AMCCRS) and is located in a protected area.</p>



<p class="wp-block-paragraph"></p>
</div></div>
</div>



<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">The project aims to achieve seismic reinforcement as well as improved energy efficiency, with a contract value of 98.6 million lei. Up to 90% of the funding comes from the National Program for the Consolidation of Buildings at High Seismic Risk, financed by the Ministry of Development, Public Works and Administration, and implementation is carried out by the Municipality of Bucharest through the Municipal Administration for the Consolidation of Buildings at Seismic Risk. The intervention seeks not only to secure a building at seismic risk class RsI, but also to preserve its architectural and cultural value and adapt it to current requirements for operation, safety and energy efficiency.</p>



<p class="wp-block-paragraph">&#8220;By signing this contract, we are taking another concrete step forward in the Municipality of Bucharest&#8217;s seismic reinforcement program. No. 1 Schitu Măgureanu is a complex project, in which we must strike a balance between three essential objectives: seismic safety, protection of built heritage, and bringing the building up to current standards of operation and energy efficiency. We are not just reinforcing a structure, we are protecting a place that is part of Bucharest&#8217;s cultural and academic memory. For AMCCRS, the signing of the contract marks the beginning of a stage in which our responsibility is to ensure the investment is implemented rigorously, respecting quality, deadlines and the building&#8217;s architectural value.&#8221; — Răzvan Munteanu, Executive Director of the Municipal Administration for the Consolidation of Buildings at Seismic Risk.</p>



<p class="wp-block-paragraph">&#8220;This is a special project, not only because of its technical complexity, but also because of the building&#8217;s architectural and cultural significance — for students, professors, actors, theatre lovers and the Bucharest community, as a whole. Our mission is to bring it up to modern standards of safety and energy efficiency while preserving its identity. Concelex&#8217;s experience with integrated solutions, as well as with similar projects, gives us the tools we need to manage a project of this scale.&#8221; — Cătălin Vișan, Deputy CEO, Concelex.</p>



<p class="wp-block-paragraph">The project adds to a broad portfolio of reinforcement works; among the historic buildings Concelex has rehabilitated or has under way are the Mihai Eminescu building of the Bucharest University of Economic Studies, the Bacău Administrative Palace, the National Bank of Romania (BNR) branch in Galați, and Buildings A and B of the interwar building at 2 Boteanu Street. The company has also recently won the reinforcement project for the Dacia-România Palace (Pinacoteca).</p>



<p class="wp-block-paragraph">The building on Schitu Măgureanu has a total floor area of over 11,800 sqm and involves a complex intervention: structural reinforcement, repair and restoration of architectural elements and artistic components, modernization of building systems, and the introduction of fire safety solutions. In addition, the works will cover thermal insulation, waterproofing, window and door replacement, and the installation of energy-efficient equipment, with an impact on energy consumption and greenhouse gas emissions. The project also involves partial demolitions, ground improvement works for the foundation, as well as utility connections and disconnections.</p>



<p class="wp-block-paragraph">Through an integrated approach to the intervention — structural reinforcement, restoration, modernization of building systems and improved energy performance — the Municipality of Bucharest and AMCCRS aim for the investment to generate long-term benefits, both in terms of user safety and in terms of heritage preservation and reduced building operating costs.</p>



<p class="wp-block-paragraph">Located at the intersection of Schitu Măgureanu Boulevard and Calea Plevnei, the building is one of the most important architectural landmarks of the Cișmigiu area, with a 100-year history. The complex was built in stages, with construction of the main building beginning in 1926 as the Palace of the League for the Cultural Unity of Romanians. Between 1950 and 1977, it housed the Institute of Theatrical and Cinematographic Art, and today it serves the &#8220;Lucia Sturdza Bulandra&#8221; Municipal Theatre and the University of Bucharest, with lecture halls, amphitheatre, library, archive and offices.</p>
</div>
<p>The post <a href="https://concelex.ro/concelex-to-retrofit-the-bulandra-theatre-building-at-1-schitu-magureanu-street/">Concelex to retrofit the &#8220;Bulandra&#8221; Theatre building at 1 Schitu Măgureanu Street</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex continued to grow in 2025: revenue of RON 1.4bn and net profit up 33%</title>
		<link>https://concelex.ro/concelex-continued-to-grow-in-2025-revenue-of-ron-1-4bn-and-net-profit-up-33/</link>
		
		<dc:creator><![CDATA[andrada]]></dc:creator>
		<pubDate>Mon, 22 Jun 2026 08:43:16 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://concelex.ro/?p=21975</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian construction company, recorded RON 1.4 billion revenue in 2025, a 17% increase compared to the previous year. At the same time, the company improved its profitability, reporting a net profit of RON 202 million, up 33% compared to 2024. This performance was driven by a strong portfolio of complex ongoing projects [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-continued-to-grow-in-2025-revenue-of-ron-1-4bn-and-net-profit-up-33/">Concelex continued to grow in 2025: revenue of RON 1.4bn and net profit up 33%</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<div class="wp-block-media-text is-stacked-on-mobile"><figure class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="862" height="1024" src="https://concelex.ro/wp-content/uploads/2026/06/Radu-cropped-862x1024.jpg" alt="" class="wp-image-21964 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/06/Radu-cropped-862x1024.jpg 862w, https://concelex.ro/wp-content/uploads/2026/06/Radu-cropped-252x300.jpg 252w, https://concelex.ro/wp-content/uploads/2026/06/Radu-cropped-768x913.jpg 768w, https://concelex.ro/wp-content/uploads/2026/06/Radu-cropped.jpg 1189w" sizes="(max-width: 862px) 100vw, 862px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian construction company, recorded RON 1.4 billion revenue in 2025, a 17% increase compared to the previous year. At the same time, the company improved its profitability, reporting a net profit of RON 202 million, up 33% compared to 2024. This performance was driven by a strong portfolio of complex ongoing projects in the energy, infrastructure, healthcare, and education sectors, as well as by newly secured contracts. Among the latter are the construction of the Craiova Regional Emergency Hospital, a RON 1.87 billion project, the Timişoara Regional Institute of Oncology, with a contract value of RON 840 million, and the expansion of the Dry Storage Facility at Cernavodă Nuclear Power Plant, a RON 213.7 million contract, all carried out in consortium. The total value of contracts signed in 2025 amounts to approximately RON 7.7 billion.</p>



<p class="wp-block-paragraph"></p>
</div></div>
</div>



<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">“Despite a year marked by economic and geopolitical volatility and unfavorable conditions for the construction market, which slowed our momentum, we recorded healthy growth — proving that we can make progress even in challenging environments. We maintain a positive outlook and are confident that, once Romania’s macroeconomic imbalances are corrected, the country’s economy will return to a solid trajectory and take its rightful place among the fastest-growing economies in Europe,” said Radu Pițurlea, Chairman &amp; CEO, Concelex.</p>



<p class="wp-block-paragraph">The company expects to continue growing at a sustained pace over the medium and long term and has budgeted for 2026 revenues over 70% higher than in 2025. This momentum will be supported by the accelerated implementation of projects in the context of PNRR program completion, as well as by contracts won in the first part of the year, which have consolidated Concelex’s position in sectors such as energy, infrastructure, and urban regeneration. The company was selected by Korea Hydro &amp; Nuclear Power (KHNP) for a RON 253.5 million contract as part of the refurbishment project for Unit 1 of the Cernavodă Nuclear Power Plant. Concelex is part of the consortium designated as the winning bidder in the first quarter of the year for the extension of Metro Line M4 in Bucharest, the Eroii Revoluției — Gara Progresul section, a RON 4.38 billion project. The company also won in 2026 the contract for the rehabilitation and consolidation of the Bucur Obor overpass, valued at RON 109 million, which involves works such as reinforcing existing infrastructure, replacing the superstructure, and rehabilitating both lanes of traffic and the maintenance walkways. The recent portfolio also includes urban regeneration projects, such as the transformation of the Crasna River promenade in Şimleu Silvaniei into a modern, accessible, and sustainable public space, as well as the development of an 11 km mobility corridor integrating cycling lanes, pedestrian paths, and green spaces in the same city. &nbsp;&nbsp;</p>



<p class="wp-block-paragraph">Concelex has secured contracts worth EUR 3 billion, while the total pipeline for the next five years amounts to approximately EUR 5 billion. Among Concelex’s most significant ongoing projects are the construction of the Major Burns Care Center within the Grigore Alexandrescu Hospital in Bucharest, the Craiova Regional Emergency Hospital, and the Timişoara Regional Institute of Oncology — all carried out in consortium — as well as a new wing for the Constanța Emergency Clinical Hospital. The company is also carrying out, in consortium, works on the Prelungirea Ghencea boulevard extension, which primarily involves widening the boulevard to four traffic lanes and extending and modernizing the tram line.</p>
</div>
<p>The post <a href="https://concelex.ro/concelex-continued-to-grow-in-2025-revenue-of-ron-1-4bn-and-net-profit-up-33/">Concelex continued to grow in 2025: revenue of RON 1.4bn and net profit up 33%</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex wins contract to seismic-retrofit the Dacia România Palace</title>
		<link>https://concelex.ro/concelex-wins-contract-to-seismic-retrofit-the-dacia-romania-palace/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Thu, 16 Apr 2026 11:37:56 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/concelex-wins-contract-to-seismic-retrofit-the-dacia-romania-palace/</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian infrastructure construction company, has been awarded the contract to deliver structural works, rehabilitation and modernization for the Dacia‑România Palace (Pinacoteca Palace), a historic building located in one of central Bucharest’s most densely built and sensitive areas. Listed in Romania’s Register of Historic Monuments, the building is classified as a seismic‑risk property [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-wins-contract-to-seismic-retrofit-the-dacia-romania-palace/">Concelex wins contract to seismic-retrofit the Dacia România Palace</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<figure class="wp-block-image"><img decoding="async" src="https://concelex.ro/wp-content/uploads/2026/04/foto-razvan-munteanu-catalin-visan-768x576.jpg" alt=""/></figure>



<p class="wp-block-paragraph"></p>



<p class="wp-block-paragraph">Concelex, a leading Romanian infrastructure construction company, has been awarded the contract to deliver structural works, rehabilitation and modernization for the Dacia‑România Palace (Pinacoteca Palace), a historic building located in one of central Bucharest’s most densely built and sensitive areas. Listed in Romania’s Register of Historic Monuments, the building is classified as a seismic‑risk property and is currently managed by the Municipal Administration for the Consolidation of Buildings at Seismic Risk (AMCCRS). The project covers a seismic retrofit and an energy‑efficiency upgrade, with a contract value of RON 88.29 million.</p>



<p class="blockquote-text wp-block-paragraph">&#8220;Through this contract, we are taking another step towards protecting an emblematic building of Bucharest, reaffirming the Municipality’s focus on conserving historic heritage and returning it to the community. By means of complex structural interventions, carried out with care for the elements that define the building’s identity, we aim to bring back into public use a landmark building for the city’s history and for the Lipscani area,” said Răzvan Munteanu, Executive Director, AMCCRS.</p>



<blockquote class="wp-block-quote  with_quote_icon is-layout-flow wp-block-quote-is-layout-flow">
<p class="wp-block-paragraph"></p>
</blockquote>



<p class="blockquote-text wp-block-paragraph">&#8220;For the Dacia România Palace, the works must significantly improve seismic safety and energy performance while preserving the building’s defining architectural features. The dense urban setting and the building’s specific characteristics require careful site planning and precise coordination across disciplines. Concelex’s experience in strengthening and rehabilitating historically significant buildings enables us to manage these complexities—from structural interventions through to the integration of modern building systems,” said Cătălin Vișan, Deputy General Manager, Concelex.</p>



<blockquote class="wp-block-quote  with_quote_icon is-layout-flow wp-block-quote-is-layout-flow">
<p class="wp-block-paragraph"></p>
</blockquote>



<p class="wp-block-paragraph">The project includes an integrated scope of works: strengthening structural walls, foundations and floor slabs; restoring façades and decorative details; rehabilitating architectural and artistic components; and upgrading all building services. Energy‑performance measures will include the modernization of exterior joinery, optimization of heating and ventilation systems, and additional solutions designed to reduce energy consumption. The scope also includes modern fire detection and suppression systems, along with updated security systems.</p>



<p class="wp-block-paragraph">The building has a basement, ground floor and two upper floors (S+P+2E) and a distinctive triangular footprint, with a rounded corner facing Smârdan Street and continuous frontages along Lipscani and Stavropoleos streets. It adjoins the National Bank of Romania branch and forms part of the historic Lipscani ensemble—factors that add further complexity both to the structural approach and to on‑site logistics.</p>



<p class="wp-block-paragraph">Built in the late 1800s as the headquarters of the Dacia‑România Insurance Company, the Pinacoteca Palace has served over time as a banking building, the home of the Conservatory of Music and Dramatic Art, a restaurant, and a footwear and leather goods store. In recent years, it has been part of the Art Section of the Bucharest Municipality Museum, housing Romanian and European paintings, sculpture, decorative arts and graphic works. Once completed &#8211; over a 36‑month period- the project will allow the Pinacoteca to return to Bucharest’s cultural circuit.</p>
<p>The post <a href="https://concelex.ro/concelex-wins-contract-to-seismic-retrofit-the-dacia-romania-palace/">Concelex wins contract to seismic-retrofit the Dacia România Palace</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Leadership Succession at Concelex: Radu Pițurlea Appointed Chairman &#038; CEO</title>
		<link>https://concelex.ro/leadership-succession-at-concelex-radu-piturlea-appointed-chairman-ceo/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Fri, 27 Mar 2026 08:13:04 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/leadership-succession-at-concelex-radu-piturlea-appointed-chairman-ceo/</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian infrastructure company, has completed its leadership succession process, with Radu Pițurlea assuming the role of Chairman &#38; CEO from founder Daniel Pițurlea. The transition to the second generation marks a new phase for the company, defined by a broader strategic vision and a stronger contribution to regional infrastructure development. The leadership [&#8230;]</p>
<p>The post <a href="https://concelex.ro/leadership-succession-at-concelex-radu-piturlea-appointed-chairman-ceo/">Leadership Succession at Concelex: Radu Pițurlea Appointed Chairman &#038; CEO</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<div class="wp-block-media-text is-stacked-on-mobile"><figure  class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="768" height="716" alt="" src="https://concelex.ro/wp-content/uploads/2026/05/radu-piturlea-chairman-ceo-concelex-768x716-1.png" class="wp-image-20881 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/05/radu-piturlea-chairman-ceo-concelex-768x716-1.png 768w, https://concelex.ro/wp-content/uploads/2026/05/radu-piturlea-chairman-ceo-concelex-768x716-1-300x280.png 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian infrastructure company, has completed its leadership succession process, with Radu Pițurlea assuming the role of Chairman &amp; CEO from founder Daniel Pițurlea. The transition to the second generation marks a new phase for the company, defined by a broader strategic vision and a stronger contribution to regional infrastructure development.</p>



<p class="wp-block-paragraph">The leadership change comes at a time of stability and sustained growth. In recent years, Concelex has recorded steady increases in revenue, improved profitability, and a strengthened portfolio of complex projects across strategic sectors such as critical infrastructure and energy.</p>
</div></div>
</div>



<div class="wp-block-group is-layout-constrained wp-block-group-is-layout-constrained">
<p class="wp-block-paragraph">&#8220;This transition reflects a natural evolution of roles. I will remain close to the team in a consultative and mentoring capacity, supporting the management and helping preserve the coherence and spirit that have defined our success so far. I am confident that, under Radu’s leadership, the company will continue to deliver essential projects for people and communities, building facilities that are necessary and truly useful in everyday life”, said Daniel Pițurlea, Founder President of Concelex.</p>



<p class="wp-block-paragraph">Under the new leadership, the company continues to rely on the values that have shaped its development: respect, integrity, responsibility, and joy. With a background in economics and solid entrepreneurial experience, Radu Pițurlea aims to accelerate the company’s progress, emphasizing innovation and projects that respond to the transformations driven by emerging technologies.</p>



<p class="wp-block-paragraph">&#8220;We have grown while staying true to the same principles that have guided us from the very beginning. Perhaps the most important of them is this: what we build must work so well that it removes worry for those who depend on it. Over time, we have aimed for our results to become synonymous with excellence in execution. Going forward, our plan is to take this mindset further and position ourselves as a European leader in infrastructure, investment, and construction — an institution recognized for quality, reliability, and character. We are pursuing expansion in areas that are relevant to the future of infrastructure and the evolution of the economy, including those where technology is reshaping how construction is done. These are the types of investments that will support the development in the coming decades and that genuinely change the way people live and work”, said Radu Pițurlea.</p>



<p class="wp-block-paragraph">Concelex encompasses a team of over 3,000 employees and subcontractors and manages a nationwide portfolio that includes airport and road infrastructure, energy developments, and the construction and rehabilitation of public facilities such as hospitals, educational institutions, and administrative buildings. The company contributes to projects with major community impact, supporting improved quality of life through public-space modernization — from healthcare infrastructure to urban regeneration. Concelex’s current contracted project pipeline amounts to 3.1 billion dollars for the next five years.</p>
</div>
<p>The post <a href="https://concelex.ro/leadership-succession-at-concelex-radu-piturlea-appointed-chairman-ceo/">Leadership Succession at Concelex: Radu Pițurlea Appointed Chairman &#038; CEO</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex Selected by KHNP for €49.8 Million Contract in Cernavoda NPP Unit 1 Refurbishment Project</title>
		<link>https://concelex.ro/concelex-selected-by-khnp-for-49-8-million-contract-in-cernavoda-npp-unit-1-refurbishment-project/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Mon, 09 Feb 2026 15:52:52 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/concelex-selected-by-khnp-for-49-8-million-contract-in-cernavoda-npp-unit-1-refurbishment-project/</guid>

					<description><![CDATA[<p>Concelex,  a leading Romanian construction company, has been awarded a EUR 49.8 million contract by Korea Hydro &#38; Nuclear Power (KHNP) for the construction of several technical facilities and administrative offices, as part of the Cernavoda Nuclear Power Plant Unit 1 Refurbishment Project, for Nuclearelectrica. The works are scheduled to begin in Q1 2026 and [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-selected-by-khnp-for-49-8-million-contract-in-cernavoda-npp-unit-1-refurbishment-project/">Concelex Selected by KHNP for €49.8 Million Contract in Cernavoda NPP Unit 1 Refurbishment Project</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-media-text is-stacked-on-mobile" style="margin-bottom:30px"><figure  class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="768" height="598" alt="" src="https://concelex.ro/wp-content/uploads/2026/05/catalin-visan-director-general-adjunct-concelex-768x598-1.jpg" class="wp-image-20884 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/05/catalin-visan-director-general-adjunct-concelex-768x598-1.jpg 768w, https://concelex.ro/wp-content/uploads/2026/05/catalin-visan-director-general-adjunct-concelex-768x598-1-300x234.jpg 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex,  a leading Romanian construction company, has been awarded a EUR 49.8 million contract by Korea Hydro &amp; Nuclear Power (KHNP) for the construction of several technical facilities and administrative offices, as part of the Cernavoda Nuclear Power Plant Unit 1 Refurbishment Project, for Nuclearelectrica. The works are scheduled to begin in Q1 2026 and will be completed by the end of 2027.</p>



<p class="wp-block-paragraph">&#8220;Being selected for this project is a strong confirmation of our capabilities in the nuclear energy sector and underscores KHNP’s confidence in our ability to deliver complex works to the highest standards of quality and safety. After two projects at the Dry Storage for Burnt Fuel facility at Cernavoda, one completed and one in progress, we are proud to continue contributing to Romania’s strategic energy infrastructure. This new contract allows us to demonstrate once again that Concelex can handle complex, high-standard projects where safety, precision, and reliability are paramount.&#8221; said Cătălin Vișan, Deputy General Director, Concelex.</p>
</div></div>



<p class="blockquote-text wp-block-paragraph">As part of the refurbishment program for Unit 1 of the Cernavodă Nuclear Power Plant, Concelex is delivering an extensive package of buildings, platforms, and infrastructure works for KHNP. The project includes operational and administrative facilities, logistics areas, electrical transformer substation, yarding services, road works and access control facilities. The scope also covers fire protection water tanks with pumping stations, systems for the relocation of existing utility pipelines and cable routes, groundwater monitoring installations, and the development of internal circulation areas for personnel, equipment, and materials. In parallel, Concelex is implementing complete utility networks, security and surveillance systems. Together, these works ensure the safe, efficient, and uninterrupted execution of the refurbishment program while meeting the stringent operational and safety requirements of a nuclear facility.</p>



<p class="wp-block-paragraph">The refurbishment of Unit 1 is a cornerstone for Romania’s nuclear energy strategy. Concelex holds certifications from the National Commission for Nuclear Activities Control (CNCAN) for nuclear construction, fabrication, and supply activities. These certifications confirm compliance with strict national and international safety standards and robust quality management systems, ensuring that all works meet the highest requirements for nuclear safety and reliability.</p>
<p>The post <a href="https://concelex.ro/concelex-selected-by-khnp-for-49-8-million-contract-in-cernavoda-npp-unit-1-refurbishment-project/">Concelex Selected by KHNP for €49.8 Million Contract in Cernavoda NPP Unit 1 Refurbishment Project</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex Wins Contract for the Development of Crasna River Promenade in Șimleu Silvaniei</title>
		<link>https://concelex.ro/concelex-wins-contract-for-the-development-of-crasna-river-promenade-in-simleu-silvaniei/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Wed, 14 Jan 2026 15:17:58 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/concelex-wins-contract-for-the-development-of-crasna-river-promenade-in-simleu-silvaniei/</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian construction company, has signed the contract for a complex urban development project that will transform the right bank of the Crasna River in Șimleu Silvaniei, Sălaj County, into a modern, accessible, and environmentally friendly area. The investment, which includes the development of a first section of the riverbed spanning 1.75 km, [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-wins-contract-for-the-development-of-crasna-river-promenade-in-simleu-silvaniei/">Concelex Wins Contract for the Development of Crasna River Promenade in Șimleu Silvaniei</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-media-text is-stacked-on-mobile"><figure  class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="768" height="513" alt="" src="https://concelex.ro/wp-content/uploads/2026/05/CLX_Amenajare-Crasna-4-768x513-1.jpg" class="wp-image-20887 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/05/CLX_Amenajare-Crasna-4-768x513-1.jpg 768w, https://concelex.ro/wp-content/uploads/2026/05/CLX_Amenajare-Crasna-4-768x513-1-300x200.jpg 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian construction company, has signed the contract for a complex urban development project that will transform the right bank of the Crasna River in Șimleu Silvaniei, Sălaj County, into a modern, accessible, and environmentally friendly area. The investment, which includes the development of a first section of the riverbed spanning 1.75 km, amounts to approximately 15 million lei and is funded through European funds.</p>



<p class="wp-block-paragraph">&#8220;We are proud to contribute to transforming an area with great potential into a community landmark. This project is more than a construction site – it is an investment in quality of life and in the future of the city. Concelex brings its expertise in complex projects to create a space that combines functionality, aesthetics, and sustainability,&#8221; said Cătălin Vișan, Deputy General Director, Concelex.</p>
</div></div>



<p class="wp-block-paragraph">The area to be rehabilitated is located in the central part of Șimleu Silvaniei and includes the Crasna riverbed, currently undeveloped and partially inaccessible, as well as several degraded public spaces and sections of adjacent streets.</p>



<p class="wp-block-paragraph">The project covers an area of 39,000 sqm, of which at least 12,500 sqm will be rehabilitated green spaces, and Concelex will provide both design and construction services. The works will include pedestrian paths, bike lanes, recreational areas, contemporary urban furniture, LED public lighting, and a video surveillance system to ensure community safety.</p>



<p class="wp-block-paragraph">The development of the Crasna promenade aims to encourage non-motorized mobility and offer residents a modern green space adapted to the needs of all age groups. The project integrates solutions for biodiversity protection and reducing environmental impact, in line with the principles of sustainable development promoted at the European level.</p>
<p>The post <a href="https://concelex.ro/concelex-wins-contract-for-the-development-of-crasna-river-promenade-in-simleu-silvaniei/">Concelex Wins Contract for the Development of Crasna River Promenade in Șimleu Silvaniei</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex modernizes the “Mihai Eminescu” building for the Bucharest University of Economic Studies</title>
		<link>https://concelex.ro/concelex-modernizes-the-mihai-eminescu-building/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Mon, 03 Nov 2025 13:14:53 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/concelex-modernizes-the-mihai-eminescu-building/</guid>

					<description><![CDATA[<p>Concelex, one of Romania’s leading construction companies, has completed the structural consolidation, rehabilitation, and outfitting of the “Mihai Eminescu” building, part of the campus of the Bucharest University of Economic Studies. The building has been transformed into a contemporary educational space, with integrated digital infrastructure and equipment that supports teaching, research, and administrative activities, following [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-modernizes-the-mihai-eminescu-building/">Concelex modernizes the “Mihai Eminescu” building for the Bucharest University of Economic Studies</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-media-text is-stacked-on-mobile"><figure  class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="768" height="432" alt="" src="https://concelex.ro/wp-content/uploads/2026/05/Concelex-ASE-13-768x432-1.jpg" class="wp-image-20890 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/05/Concelex-ASE-13-768x432-1.jpg 768w, https://concelex.ro/wp-content/uploads/2026/05/Concelex-ASE-13-768x432-1-300x169.jpg 300w" sizes="(max-width: 768px) 100vw, 768px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, one of Romania’s leading construction companies, has completed the structural consolidation, rehabilitation, and outfitting of the “Mihai Eminescu” building, part of the campus of the Bucharest University of Economic Studies. The building has been transformed into a contemporary educational space, with integrated digital infrastructure and equipment that supports teaching, research, and administrative activities, following a total investment of 164.63 million lei.</p>



<p class="wp-block-paragraph">&#8220;Education needs spaces that inspire, not just function. We are proud to have revitalized a key academic landmark in Bucharest, through a project that reflects our long-standing commitment to educational infrastructure. It’s a consistent pillar in our portfolio, with works delivered for universities, high schools, and schools across the country,” said Cătălin Vișan, Deputy General Manager, Concelex.</p>
</div></div>



<p class="wp-block-paragraph">Concelex carried out structural consolidation, functional reconfiguration, thermal rehabilitation, interior and exterior finishing, as well as full furnishing and IT equipment installation. The building was equipped with over 700 computers, 88 video projectors and an equal number of interactive whiteboards, sound systems in amphitheaters, electronic bulletin boards, and an info point. Concelex carried out structural consolidation, functional reconfiguration, thermal rehabilitation, interior and exterior finishing, as well as full furnishing and IT equipment installation. The building was equipped with over 700 computers, 88 video projectors and an equal number of interactive whiteboards, sound systems in amphitheaters, electronic bulletin boards, and an info point. <p>Throughout the execution phase, Concelex mobilized an average of 135 people per month, maintaining a steady pace and attention to detail. The works covered the entire building, which includes a basement, ground floor, five upper floors, and a technical floor, with a total built area of over 14,000 square meters.</p><p>The “Mihai Eminescu” building houses classrooms and seminar rooms, amphitheaters, laboratories, research centers, and administrative spaces, all arranged in line with the current requirements of higher education.</p><p>The project was financed by the Ministry of Development, Public Works and Administration, which allocated 160.64 million lei, and by the Bucharest University of Economic Studies, with a contribution of 3.99 million lei. Implementation was carried out through the National Investment Company.</p></p>
<p>The post <a href="https://concelex.ro/concelex-modernizes-the-mihai-eminescu-building/">Concelex modernizes the “Mihai Eminescu” building for the Bucharest University of Economic Studies</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Concelex to Modernize Arad Penitentiary for RON 49 mn</title>
		<link>https://concelex.ro/concelex-to-modernize-arad-penitentiary-for-ron-49-mn/</link>
		
		<dc:creator><![CDATA[mcp_importer]]></dc:creator>
		<pubDate>Tue, 14 Oct 2025 15:12:54 +0000</pubDate>
				<category><![CDATA[Press Releases]]></category>
		<guid isPermaLink="false">https://staging.spread.technology/concelex/concelex-to-modernize-arad-penitentiary-for-ron-49-mn/</guid>

					<description><![CDATA[<p>Concelex, a leading Romanian construction company, will carry out modernization works on four detention pavilions and one technical building at Arad Penitentiary. The contract is worth RON 49.39 million (excluding VAT), and the interventions aim to improve accommodation conditions, increase energy efficiency, and enhance the safety of detention spaces. &#8220;Modernizing penitentiary infrastructure is an essential [&#8230;]</p>
<p>The post <a href="https://concelex.ro/concelex-to-modernize-arad-penitentiary-for-ron-49-mn/">Concelex to Modernize Arad Penitentiary for RON 49 mn</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-media-text is-stacked-on-mobile"><figure  class="wp-block-media-text__media"><img loading="lazy" decoding="async" width="345" height="198" alt="" src="https://concelex.ro/wp-content/uploads/2026/05/Plan-345x198-1.jpg" class="wp-image-20893 size-full" srcset="https://concelex.ro/wp-content/uploads/2026/05/Plan-345x198-1.jpg 345w, https://concelex.ro/wp-content/uploads/2026/05/Plan-345x198-1-300x172.jpg 300w" sizes="(max-width: 345px) 100vw, 345px" /></figure><div class="wp-block-media-text__content">
<p class="wp-block-paragraph">Concelex, a leading Romanian construction company, will carry out modernization works on four detention pavilions and one technical building at Arad Penitentiary. The contract is worth RON 49.39 million (excluding VAT), and the interventions aim to improve accommodation conditions, increase energy efficiency, and enhance the safety of detention spaces.</p>



<p class="wp-block-paragraph">&#8220;Modernizing penitentiary infrastructure is an essential component of a functional and humane detention system. We are pleased to implement this complex project, which brings together our technical expertise and a responsible approach aligned with European standards in the field,” said Cătălin Vișan, Deputy General Manager, Concelex.</p>
</div></div>



<p class="wp-block-paragraph"></p>



<p class="wp-block-paragraph">The works, covering a total built area of nearly 18,000 sqm, will be carried out in stages over a period of 48 months. They include building renovations — from plaster repairs and façade rehabilitation to window replacements, interior finishes upgrades, and improvements to common areas, sidewalks, access ramps, and railings.</p>



<p class="wp-block-paragraph">The project also involves comprehensive upgrades to utility systems: complete replacement of water and sewage networks, full rewiring for lighting and power outlets, installation of LED fixtures and safety systems, as well as modernization of internal heating networks and optimization of the existing boiler system.</p>



<p class="wp-block-paragraph">Energy efficiency will be ensured through both thermal insulation of the buildings and the installation of photovoltaic panels on the pavilion rooftops, enabling the use of renewable energy.</p>



<p class="wp-block-paragraph">Additional works include the rehabilitation of civil protection shelters, focusing on waterproofing, ventilation systems, and the installation of air intake units.</p>



<p class="wp-block-paragraph">Upon completion of the works, detention conditions will be significantly improved, energy efficiency will increase, and operating costs will be reduced. The interventions will also help align Arad Penitentiary with European standards for comfort and safety in detention facilities.</p>
<p>The post <a href="https://concelex.ro/concelex-to-modernize-arad-penitentiary-for-ron-49-mn/">Concelex to Modernize Arad Penitentiary for RON 49 mn</a> appeared first on <a href="https://concelex.ro">Concelex</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
